Build a Saleable Output Loss Tree

A loss tree starts from one time period and one line boundary, then converts rated opportunity into saleable product through scheduled time, planned stops, running time, speed loss, production quantity, rejects and quality disposition. Each branch needs a defined source rather than a borrowed benchmark.

01 · Buyer or factory inputs

Information the decision needs

  • Defined line boundary and reference SKU
  • Rated basis and scheduled production calendar
  • Planned-stop categories and actual durations
  • Run time, speed and count sources
  • Reject, rework, hold and release records
  • Consistent shift, day or campaign reporting period

02 · Operating objective

What completion should achieve

Explain where the nameplate-to-saleable-output gap occurs without double counting losses or hiding quality status.

03 · Required controls

Turn the objective into controlled work

  1. 01

    Freeze one reporting period, SKU basis and line boundary

  2. 02

    Separate unscheduled calendar time from scheduled production opportunity

  3. 03

    Remove planned stops before calculating availability loss

  4. 04

    Quantify running-speed loss against the documented reference condition

  5. 05

    Reconcile produced units with rejects, holds and released saleable product

  6. 06

    Keep unknown or unreconciled loss as a visible branch for investigation

04 · Factory interfaces

What connects to this decision

  • Production plan to scheduled opportunity
  • Machine counters to complete-line boundary
  • Downtime codes to availability
  • Quality status to saleable product
  • Warehouse receipts to released count reconciliation

05 · Evidence to collect

Records that make review possible

  • Versioned loss-tree definitions
  • Source map for time, count and quality data
  • Period reconciliation worksheet
  • Unknown and adjustment register
  • Improvement action linked to a specific branch

06 · Common failure modes

Do not confuse a pattern with a confirmed cause

1Losses use different time periods or SKU boundaries

2Rejects and quality holds are combined without status

3Planned stops are counted again as availability loss

4Theoretical factors are presented as achieved factory performance

07 · Responsibility boundary

Name who confirms each part

RolePossible responsibility in this stage
Operations ownerDefines the operating condition, assigns the record and confirms that actions fit the production plan.
Quality ownerDefines product-status, sampling, release and escalation controls within the factory system.
Maintenance ownerConfirms safe technical work, equipment condition, evidence and restart requirements.
Supplier / Allot TechReviews the documented interface or symptom and coordinates project-specific questions within the agreed scope.

08 · Completion criteria

Evidence that the stage can advance

  • All branches share one period and boundary
  • Time and quantity totals reconcile
  • Saleable output follows an explicit release definition
  • Unknowns are visible rather than allocated arbitrarily
  • The factory can identify which loss branch needs evidence next

Decision support

Questions operating teams ask

Is a loss tree the same as OEE?

It can use related categories, but the factory must define its own boundaries, factors and saleable-product status before comparing results.

Why keep quality holds separate from rejects?

Held product may later be released, reworked or rejected, so its status and timing affect reconciliation.

Next factory decision

Water Bottling Factory Setup, Startup & Operations

Connect equipment, utilities, people, packaging materials, hygiene, quality control, maintenance and startup procedures before expecting stable saleable output.